Otter Road Bridge Replacement

Project Summary

  • Location:  Otter Road at Loutsenhizer Canal
  • Designer:  City of Montrose
  • Contractor:  Mountain Valley Contracting (Grand Junction, CO)
  • Project Cost:  $254,000
  • Completed:  May 2017

Project Overview

Prior to replacement, Otter Road crossed over the Loutsenhizer Canal utilizing a narrow I-beam bridge dating back to the 50s that was experiencing undermining of the roadway due to failure of the bridge's timber headwall structures. This bridge was replaced with an aluminum box culvert structure that widened the roadway and increased the hydraulic capacity of the Loutsenhizer Canal. 